| Residential Guide |
|
Thu Jul 02 22:45:48 CDT 2009 |
| |
|
|
| Program Type |
Probability |
Expected Time |
| Cycled Air Conditioning |
Unlikely |
Undetermined |
| Interruptible Water Heating |
Scheduled |
04:00 PM - 09:00 PM |
| |
|
|
Control times are subject to change as weather conditions and other variables affecting the load change. All times are approximate. |
|
| Control times and probability displayed here are only for load control initiated by Great River Energy.Load control initiated by your local cooperative is not reflected on this page. |
|
| |
|
|
| Last Updated: 07/02/2009 05:53 |
|